Manual Description
The total preload torque should be within the total preload H torque specification. Apply anti-corrosive oil to the threads of the drive pinion K and the seating surface of the new drive pinion lock nut. If the drive pinion lock nut torque or the total preload torque exceeds the specifications, replace the collapsible spacer and tighten it again to adjust.
Remove the differential side shaft and differential side flange using suitable tool. Then drive the new side oil seal in evenly to the gear carrier using suitable tool. Remove the carrier cover bolts and separate the carrier cover from the gear carrier using Tool.
Also remove any moisture, oil, or foreign material adhering H to the application and mating surfaces. Remove the front final drive assembly bolts, then remove the front final drive assembly. Fill the front final drive assembly with differential gear oil after installation.
Manual Cover
General